A proposal can change. An approval creates a commitment. Follow the record behind your City costs, from the budget talks to the recorded vote.

At our last source check: Nov 27, 2026. This is a dated record, not a live meeting feed.

DRAFT At our last source check

What to watch in the proposed budget

The checked record contains Administration’s draft for deliberation Nov 23–27, 2026. The draft is not an adopted budget. Proposed costs, forecasts, and the final decision are different things.

Your household costs

Start with the proposed tax and utility changes, and the assumptions behind the example home.

See the proposed bill changes →

Long-term commitments

New facilities can bring repayment, staffing, maintenance, and replacement costs beyond construction.

Follow major projects →

The next evidence to look for

The budget adoption motion, any amendments, the recorded vote, and the final tax and utility schedules.

Read the City’s draft budget ↗

To follow the official discussion, open the City’s budget presentation meeting and recording. Check the City’s latest meeting information before relying on a proposal.

Recent decision record

Source-backed milestones. These dates describe the documents and decisions, rather than when this website was redesigned.

  1. First reading only

    Recreation centre borrowing

    Borrowing Bylaw B-39/2026 had first reading only, carried with no recorded vote. At our last source check, the extra borrowing was conditional on later readings and was not in force.

    Read the draft minutes ↗ · What this means for the project →
  2. Draft presented

    The proposed budget reaches Council

    The City’s budget presentation describes projected debt and future costs. Those forecasts are not actual borrowing or an adopted budget.

    Open the City’s meeting record ↗
  3. Historical approval

    The budget for 2026

    Council reduced the proposed tax increase before adopting the budget. The minutes record that the motion carried, without a recorded vote count.

    Read the Council minutes ↗ · See the approved figures →

Who adopted each budget

Share this section

Read the recorded votes in full. If the minutes say only “carried,” that does not establish how each councillor voted. The record does not tell us anyone’s reasons.

Open the budget votes and approval record
Projection

6–1 against the 2022 budget is Councillor Spearman’s recorded no vote on a budget adoption. The 2024 adoption is not in this table: those minutes were not part of the record that was checked.

  • “Inherited” describes the council term only. If any part of this record is quoted, all of it should be.
  • The 2024 budget (adopted Nov 20, 2023) is not in this table: its adoption minutes were added to the dataset after this record was vetted.
Read the evidence & sources

All four 2022–2025 budgets were adopted by the council elected in October 2021 (Mayor Brown). Heather Spearman was a councillor on that council and, by rotation, Deputy Mayor. The 2026 budget was adopted by the council elected Oct 20, 2025, with Spearman as Mayor.

Spearman’s recorded acts on the previous council’s budgets run both ways: she voted against the 2022 budget (6-1) and against the committee recommendation of the 2023 budget and 5.97% (5-2); she moved the 2025 capital budget; her votes on the 2023 and 2025 adoptions are not recorded.

Budget adoption motions in the saved minutes (no reasons for any vote are recorded, and none are inferred)
BudgetMeetingMotionWhat the minutes record
2022Special Council, Dec 13, 20212021-C-440 (moved by Deputy Mayor Petrow): operating $173,878,950, capital $104,014,000Recorded vote 6 for, 1 against. Against: Councillor H. Spearman
2023Council Budget Committee, Nov 25, 20222022-CBC-047 (moved by Councillor Kolson): recommend 2023 budgets and a 5.97% tax increaseCarried 5-2. Opposed: Mayor Brown and Deputy Mayor Spearman
2023Council, Dec 5, 20222022-C-507 (moved by Councillor Chapman): operating $187,684,690, capital $67,798,340“Carried”, no count. Spearman present; her vote is not recorded
2025Council, Nov 19, 20242024-C-366 operating $228,826,130 (Petrow); 2024-C-367 capital $174,674,612 (moved by Deputy Mayor Spearman); 2024-C-368 4.74% (Kolson)All “Carried”, no count. Her votes on the operating budget and the tax rate are not recorded
2025 feesCouncil, Nov 19, 20242025 user fees and charges bylaw (a fees bylaw, not the budget)Spearman the only vote against at all three readings (5-1). The procedural motion permitting third reading, which she moved, “Carried Unanimously”
2026Special Council, Dec 9, 20252025-C-381 operating $299,164,206 (Glass); 2025-C-382 capital $215,894,242 (Shima); 2025-C-383 4.6% (Kolson)All “Carried”, no count. Individual votes not recorded

Special Council meeting minutes, Dec 13, 2021 (2022 budget adoption, recorded vote 2021-C-440) -;, retrieved Nov 20, 2026; Council meeting minutes, Dec 5, 2022 (2023 budget adoption, 2022-C-507) -;, retrieved Nov 20, 2026; 2024 Council Approved Budget, p. 17, retrieved Nov 20, 2026; 2025 Council Approved Budget (cover title; official airdrie.ca getLink.cfm?ID= -> getDocument.cfm?ID=, filename 2025_Council_Approved_Budget.pdf). Running headers on many inside pages still say "2025 Budget for Council Deliberation" (leftover from the deliberation template). Checked 2026-11-27: the live official PDF is byte-identical to this saved file (same sha256). Mayor's message (p. 6): "In November 2024, after extensive deliberations, the 2025 Operating and Capital Budgets were approved by Council." The book reprints the Nov 19, 2024 approved totals ($228,826,130 operating; $174,674,612 capital). This is the approved book, not the pre-approval deliberation draft., p. 8, retrieved Nov 20, 2026; 2026 Council Approved Budget, p. 10, retrieved Nov 20, 2026; Airdrie Municipal Election: "The Airdrie Municipal election was held October 20, 2025.", retrieved Nov 20, 2026; Council Budget Committee agenda package, Mar 20, 2023, containing CBC minutes of Nov 21, 24 and 25, 2022 (2022-CBC-047 budget recommendation) -;, retrieved Nov 20, 2026; Council Budget Meeting minutes, Nov 19, 2024 (2025 Budget Deliberation Day 4; 2025 budget adoption) -;, retrieved Nov 20, 2026; Special Council meeting minutes, Dec 9, 2025 (2026 budget adoption, 2025-C-381 to -384) -;, retrieved Nov 20, 2026

DRAFT

$1.97 million (2.0%) for the Southwest Recreation Centre and $0.81 million (0.8%) for fire staffing are called “previously approved” in the 2027 draft.

  • A proposal in the cited draft, not an approved charge or result. Check the latest Council record for later decisions.
  • No motion names the 0.8% or $814,000; those are 2027 draft figures.
  • The minutes record only a question about phasing in over “five years rather than four years”; the book says five.
Read the evidence & sources

DRAFT (for deliberation Nov 23–27, 2026). The 2027 draft’s net baseline includes two adjustments the City calls “previously approved”: a dedicated 2.0% for the Southwest Recreation Centre ($1.97M) and a dedicated 0.8% for Highland Park fire staffing ($0.81M).

Fire 0.8% (the 2027 DRAFT figure): a council-level approval with no recorded vote, inside the Dec 9, 2025 adoption of the 2026 budget. The approved 2026 book says “Council approved the use of the Tax Stabilization Reserve to phase in these costs over five years” and budgets a $3,291,000 draw.

Southwest Recreation Centre 2.0% (the 2027 DRAFT figure): no approving motion has been found in any saved minutes, so it is not attributed to any council.

Budgets adopted, 2022–2026

Share this section

The approved municipal tax change is the City’s own share. Your complete tax bill also includes charges collected for others. Understand the difference.

Compare the past budget approvals

4.30% municipal tax increase in the 2022 budget, adopted 6–1.

Read the evidence & sources

2022 budget adopted Dec 13, 2021 by recorded vote 6-1 (motion 2021-C-440, Petrow); Councillor Heather Spearman cast the only vote against; operating budget $173,878,950, capital $104,014,000; CBC-recommended 4.30% municipal tax increase = $2,771,843, partially addressing a $5,742,313 shortfall (rest from $1,970,470 General Operating Fund for COVID-19 and a $1,000,000 reserve draw). City estimate for average home assessed at $385,000: MUNICIPAL tax +$80.19/yr; City utilities +$83.72/yr; 'Total Cost per Year' $163.91 ($13.66/mo) = municipal + utilities, EXCLUDES provincial education tax. Average residential utility bill (28-day cycle, 13 m3) $121.31 (2021) → $127.75 (2022)

5.97% municipal tax increase in the 2023 budget, and $19.9 million added to the proposed capital budget.

Read the evidence & sources

2023 budget adopted Dec 5, 2022 (motion 2022-C-507, Chapman, 'Carried', no recorded vote): operating $187,684,690, capital $67,798,340; 5.97% municipal tax increase (4.97% municipal services + 1.0% capital) raising $4,116,709. City estimate for average home assessed at $420,000: MUNICIPAL tax +$98 (4.97%) + $20 (1.0%) = +$118/yr; City utilities +$178/yr; the City's '$296/yr (~$24.68/mo) Total Cost' is municipal tax + utilities and EXCLUDES the provincial education tax. May 15, 2023 tax-rate report (median home $420,000 → $470,000): municipal +$9.87/mo (5.97%); PROVINCIAL education tax +$0.37/mo. Administration had proposed capital of $47,886,600; CBC added $19.9MM (incl. $20,383,000 land acquisition for civic needs/rights of way). CBC budget recommendation 2022-CBC-047 (Nov 25, 2022; moved by Kolson) carried 5 in favour, 2 opposed (Mayor Brown, Deputy Mayor Spearman)

$5.2 million more in municipal tax revenue in the 2024 budget.

  • The 2024 book projected tax increases of $9.0MM for 2025 and $12.7MM for 2026; the increases actually approved were $3.9MM and $4.2MM.
Read the evidence & sources

2024 budget: Council approved a municipal tax revenue increase of $5.2 million ($2.9 million municipal services, $2.3 million capital); average household +$146.91/yr or $12.24/month; 2024 operating budget $207,184,963

$15.1 million added to the proposed 2024 capital budget, which was then adopted at $131,618,910.

Read the evidence & sources

2024 capital budget adopted Nov 20, 2023 at $131,618,910; Administration had proposed a 2024 capital budget of $116.5MM and 'an increase of $15.1MM was made during the CBC capital budget deliberations bringing the 2024 capital budget to $131.6MM'. Separately (operating), the 2024 budget book says the Administration Proposed Budget had a $7.2MM revenue shortfall; CBC reduced it by $2MM (reduced expenditures, increased user fees, and an $838K withdrawal from the General Operating Reserve for one-time expenditures) and the remaining $5.2MM was funded by a municipal tax revenue increase

Future gaps and budget stages

Share this section

A department request, the amount brought to Council, and the final approved budget are different stages. A future funding gap is a planning issue, not money already spent.

Follow how proposed amounts became approved budgets
DRAFTour calculation

$18,974,000 is the 2027 draft’s all-in gap. Earlier books defined the gap differently, so the amounts are not one series.

  • A proposal in the cited draft, not an approved charge or result. Check the latest Council record for later decisions.
  • Book-to-book comparisons of operating totals are unreliable because the City changes what it counts.
Read the evidence & sources

The 2026 book gives 2025 tax-supported spending as $175,293,000 on one page and $170,845,000 on another. The 2027 draft book restates 2026 tax-supported spending from $241.4M to $181,688,000 and moves developer levies into a separate $64,605,000 budget.

The City’s note on the 2027 DRAFT shortfalls: “It does not represent an operating deficit.”

the supporting record: the 2025→2026 total operating budget is +29.3% using the 2026 book for both years (2025 restated at $231,340,000). Using the 2025 book’s $228,826,000 as the base gives +30.7%, but that mixes definitions. Tax-supported only, 2025 $175.3M to 2026 $181.7M is +3.6%, and that crosses books. No single year-over-year figure should be quoted without naming the book.

What each book projected as the amount required to balance future years (City projections, not decisions)
BookDefinitionProjected gaps
2024 bookCombined tax + utility budget$14.2M (2025), $26.9M (2026)
2025 bookTax-supported only$18.6M (2026), $24.3M (2027)
2026 bookTax-supported, with $59.3M of developer contributions added to both revenue and expense$10.8M (2027), $18.7M (2028)
2027 book (DRAFT, for deliberation Nov 23–27, 2026)“All-in”, including discretionary items$18,974,000 (2027), $37,070,000 (2028), $57,523,000 (2029), $70,358,000 (2030)
DRAFTour calculation

$4.2 million was approved for 2026 after a $5.9 million proposal. The 2027 draft’s $18,974,000 is a different stage and is not adopted.

  • A proposal in the cited draft, not an approved charge or result. Check the latest Council record for later decisions.
  • 2023 cycle, for reference (a different stage): the Council Budget Committee recommended a 5.97% municipal tax increase on Nov 25, 2022, carried 5-2.
Read the evidence & sources

¹ Pre-approval stages are Administration’s figures. Department submissions and the amount put to Council for deliberation are prepared by City Administration before Council deliberates; only the “approved” column is a Council decision.

The 2027 DRAFT stage is not defined like the others: the 2027 book uses an “all-in approach” with no department-submission stage, so its $18.97M is not the same stage as the $7.2M / $6.2M / $5.9M figures.

The same budget-process stage in each book (the City’s own figures)
Budget cycleDepartment submissions¹Amount put to Council for deliberation¹Approved tax increaseApproved as % of deliberation amount
2024 (presented to and adopted by the previous council)$14.2M$7.2M$5.2M72%
2025 (presented to and adopted by the previous council)$14.3M$6.2M$3.9M = 4.74%63%
2026 (presented to and adopted by the Spearman council)$15.8M$5.9M (≈6.5% implied, our arithmetic)$4.2M = 4.6%71%
2027 — DRAFT (Administration’s draft presented to the Spearman council, not adopted; for deliberation Nov 23–27, 2026)not publishedall-in $18,974,000 = net baseline $8,237,000 + deliberation items $10,737,000pendingpending

Reserves and debt

Share this section

Reserves: money set aside

Some funds are restricted to a particular purpose. A large reserve balance does not mean all that money can be used to reduce taxes.

Debt: money to repay

Borrowing helps fund work now and creates repayment costs later. Developer charges are intended to repay some growth-related borrowing.

$242,040,132 in reserves at the end of 2025, up from $153,429,685 in 2021, including $68.5 million in developer levies that are not free to spend.

  • Offsite levy reserves ($68.5M) are restricted developer money, not free cash. Nominal dollars.
Read the evidence & sources

Total reserves (audited) at year end: $153,429,685 (2021), $174,583,398 (2022), $209,721,770 (2023), $226,429,705 (2024), $242,040,132 (2025). 2025 Annual Report breakdown: operating reserves $81.4 million ($39.6M General Operating Reserve, $33.3M Tax Stabilization Reserve, $8.5M other), capital reserves $42.2 million, offsite levy reserves $68.5 million, utility reserves $46.7 million. City: the General Operating Reserve 'equaled approximately 23% of the tax supported operating budget'. The four categories as printed total $238,667,294; the remaining $3,372,838 is Airdrie Housing $2,490,996 and Library $881,842. Offsite levy reserves are restricted developer levy money, not money the City can spend freely.

$61.3 million in debt at the end of 2025, 16.2% of the provincial limit.

  • The City notes that $377 of the $681 per resident is developer-levy funded.
Read the evidence & sources

Long-term debt at end of 2025 was $61.3 million ($681 per capita); debt limit $377.9 million with 16.2% utilized; debt service limit $63.0 million with 12.6% utilized

Explore forecast debt and borrowing costs

DRAFT The proposed budget’s forecasts are not current debt. Earlier projections are retained as history, not presented as the latest outcome.

Projection

$514 million of debt in 2030, $69 million over the provincial limit, in the 2026 budget book’s projection. A later draft moves that date.

Read the evidence & sources

2026 budget book: City projected to exceed the provincial debt limit in 2030 with debt reaching $514MM, $69MM above the allowable threshold; City will formally request Ministerial authorization to exceed the limit. Due to insufficient Offsite Reserve balances, some growth projects are now 100% debt funded despite Debt Management policy limiting growth debt to 50% of cost

DRAFT

2028 is when the 2027 draft says debt would pass the provincial limit.

  • A proposal in the cited draft, not an approved charge or result. Check the latest Council record for later decisions.
Read the evidence & sources

DRAFT (2027 Budget for Council Deliberation, not approved): deliberations Nov 23, 25 and 27, 2026; based on the capital plan as drafted (not yet adopted by Council), the City is 'projected to exceed its regulated debt limit beginning in 2028, when debt is forecast to reach $485.5 million, or $36.1 million above the projected limit' - $485.5M is a projection, not current debt. Book context: growth-related infrastructure is 'more than half of the City's projected debt', intended to be repaid from developer levies, and without it borrowing 'would remain within the regulated limit'; 'this may include seeking Ministerial approval for borrowing above the regulated debt limit'. Draft 2027 capital budget $156.8 million; ten-year plan $1.4 billion

DRAFT

$312.8 million of forecast debt in the 2027 draft, 74% of the debt limit.

  • A proposal in the cited draft, not an approved charge or result. Check the latest Council record for later decisions.
Read the evidence & sources

DRAFT forecast (2027 Budget for Council Deliberation, not approved): City of Airdrie 2027 budget presentation slide 'Capital Decisions Extend Well Beyond 2027' (Nov 3, 2026 Council meeting, public webcast; draft budget, not approved): '$312.8M' 2027 forecast debt, 'ABOUT 70%' 'Growth-related debt $217.1M' ('Developer levies are expected to repay eligible growth-related borrowing over time'); debt limit '$422.4M', '74% debt limit used'; 'Forecast debt remains within the regulated limit for one more year'; '$156.8M 2027 capital budget'; '$1.4B 10-year capital plan'; footer 'Capital approvals also create future operating, debt-servicing and lifecycle obligations.' DiscoverAirdrie reported the same figures and that the city is working with the province on future debt-limit requirements (that 'working with the province' line is news-only; it is not on the slide)

DRAFT

4.5% interest assumed on new debt in the 2027 draft. It is a planning input, not a loan rate.

  • A proposal in the cited draft, not an approved charge or result. Check the latest Council record for later decisions.
  • The 4.5% is a planning input to the draft budget, not a loan rate.
Read the evidence & sources

DRAFT forecast (2027 Budget for Council Deliberation, not approved): City of Airdrie 2027 budget presentation slide 'Key Assumptions Behind the 2027 Budget' (Nov 3, 2026 Council meeting, public webcast), Debt box: 'Planned debt assumes 4.5% interest; actual rates and issuance timing may differ.' Slide footer: 'These assumptions are planning inputs, not guarantees. Material changes will be reflected in forecasts and future budgets.' Also reported by DiscoverAirdrie for the 2027 draft budget, and for the Jul 7, 2026 rec centre decision, where it reported Deputy CFO Meghan Bigney said the levy calculations 'assumed a 4.5 per cent interest rate' and 'the city compares borrowing options through the province and financial institutions' Slide subtitle: 'Planning assumptions will be updated as rates, funding and project timing are confirmed'.

3.80% on a 5-year municipal loan on October 30, 2026, up from 3.10% on January 30, in the Province’s posted rates.

Read the evidence & sources

Alberta Loans to Local Authorities indicative interest rates in 2026 (5 / 10 / 15 / 20 / 25 / 30-year): Jan 30, 2026 3.10% / 3.58% / 4.00% / 4.30% / 4.48% / 4.59%; Jun 30, 2026 3.26% / 3.68% / 4.04% / 4.30% / 4.47% / 4.56%; Sep 29, 2026 3.72% / 4.09% / 4.41% / 4.66% / 4.81% / 4.89%; Oct 30, 2026 3.80% / 4.18% / 4.51% / 4.75% / 4.89% / 4.96% (latest posted). Province states these 'indicative interest rates are the basis of calculating prepayment penalties' and 'represent an estimate of the interest rates the Government of Alberta could construct in the financial market'

3.9% and 3.7% effective rates on the City’s 2025 bank loans, locked in with interest-rate swaps.

Read the evidence & sources

City bank loans taken in 2025 are CORRA-based (variable) but effectively fixed at 3.9%/3.7% by swaps: 'To manage interest rate exposure associated with 2025 variable-rate borrowing, the City entered into amortizing interest rate swaps.' The City 'entered into two amortizing interest rate swap agreements with The Toronto-Dominion Bank to manage exposure to variability in cash flows on Canadian Overnight Repo Rate Average ("CORRA")-based borrowings. Under the swaps, the City pays a fixed rate and receives a variable rate based on CORRA plus 0.90%.' Positions at Dec 31, 2025: Roads programs $4,266,307 notional, fixed 3.9%, maturity 4/1/2040, fair value $(33,204); Fire program $2,394,772, fixed 3.7%, maturity 4/1/2034, $758; total $6,661,079, $(32,446). Also 2025: FCM Clean Energy Improvement Program loan $2,165,280 'bears interest at 2.0%', maturing Dec 20, 2044

Projection

Off-site levies must be kept separate, used only for their stated purpose, and reported to the public every year. The City’s model charges 2.5% interest when a levy reserve is in deficit.

Read the evidence & sources

The Municipal Government Act, s.648(5): off-site levies and their interest “must be accounted for separately … and must be used only for the specific purpose … for which it is collected”.

The annual public-report duty is in s.648.4(2): “A municipality must, on an annual basis, make a report on an off-site levy publicly available” (contributions, uses by project, balances).

The City’s own Bylaw B-11/2019 also requires one: “11.1 The City Manager shall report annually to Council regarding the Off-site Levy …” and “11.2 The annual report shall be made available to the public”.

Annual off-site levy reports for 2019–2025 were not found online. That is a records lead, not evidence of non-compliance.

The levy model charges interest of 2.5% a year when a levy reserve account is in deficit.